架空线路横担、螺栓及绝缘子安装规范图解
Graphical specification for installation of overhead transmission lines, bolts and insulators
横担
Transverse load
1. 线路横担及其附件均应热镀锌。
1. lines and their accessories should be hot-dip galvanized.
2. 横担安装应平正,安装偏差不应超过下列规定数值:春晨电机绕组线
2. the installation of the cross arm should be straight and the installation deviation should not exceed the following specified values:
1)横担端部上下歪斜不应大于20mm;
1) the upper and lower skew of the end of the transverse load should not be greater than 20mm;
2)横担端部左右扭斜不应大于20mm;春晨电机绕组线
2) the torsion at the end of the transverse load should not be greater than 20mm;
3)双杆的横担,横担与水泥杆连接处的高差不应大于连接距离的5/1000;左右扭斜不应大于横担总长度的1/100。
3) the height difference between the double arm cross arm, the cross arm and the cement rod should not be greater than the 5/1000 of the connection distance; the left and right skew should not be greater than the 1/100 of the total length of the cross arm.
架空线路横担、螺栓及绝缘子安装规范图解电机引接线
Graphical specification for installation of overhead transmission lines, bolts and insulators
单层双横担水平布置方式
Horizontal arrangement of single layer double lateral load
架空线路横担、螺栓及绝缘子安装规范图解电机引接线
Graphical specification for installation of overhead transmission lines, bolts and insulators
双层双横担水平布置方式
Horizontal arrangement of double double horizontal load
3.直线杆横担安装:单顶支架上侧抱箍中心线距离杆顶15cm,双顶支架上侧抱箍中心线距离杆顶35cm,水平排列时10kV线路横担中心水平线距离杆顶15cm,单横担应安装于负荷侧。高、低压同杆架设绝缘导线时,横担间的*小垂直距离为1.2m。
3. linear pole transverse load installation: the center line of the top hoop of the single top bracket is 15cm, the center line of the upper side of the double top bracket is 35cm from the top of the rod, and the horizontal line of the 10kV line is 15cm from the top of the bar when the horizontal arrangement is horizontally arranged. The single cross load should be installed on the load side. The minimum vertical distance between the cross arm is 1.2m when high voltage and low voltage are used to erect insulated conductors.